Panel Boards Update – May 18, 2022
Installed panel boards, cable trays, gutters and terminated wires at ee room fourth floor 2. Installed panel boards, cable trays, gutters, and terminated wires at ee room third floor
Read MoreInstalled panel boards, cable trays, gutters and terminated wires at ee room fourth floor 2. Installed panel boards, cable trays, gutters, and terminated wires at ee room third floor
Read MoreSite Visit & Inspection of Mr. Ruben Reyna & Mr. Fructucso Layrol of Landbank Dipolog
Read MoreInstalled floor drain at upper ground floor and second floor clinic area pipe chase
Read MoreInstalled cable trays for outdoor unit at roof deck gridlines 8-12/A-H 2. Arranged and terminated wires at roof deck GL 2-3/D-E 3. Arranged and terminated wires at ee room fourth floor 4. Arranged and terminated wires at ee room third floor 5. Arranged and terminated wires at ee room second floor 6. Arranged and terminated
Read More1. continue installation of mainline copper pipe from riser to outdoor unit connections at roofdeck GL 7 – 8 / D – H. Work 95% progress at riser 2 2. fixing of additional steel brackets to fit with the outdoor units in preparation to the installation of outdoor units at Third floor patient’s room GL