1. On going installation of stair tiles @ stair-1 from third floor level up to mid landing fourth floor level.
2. Lay outing for concrete topping @ fire escape 1 and fire escape-3 from lower ground floor level up to roof deck level.
3. Plastering and edging of plant box @ main lobby ground floor level.
4. On going concrete topping @ roof deck level