DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (PAINTING WORKS) FRONT AND LEFT SIDE ELEVATION AND HIGH CEILING CHANDELIER DESIGN – July 28, 2022
1. Application of final color and rectification of uneven concrete surfaces @ front elevation and Left side elevation above stone cladding is on going.
2. Application of final color @ high ceiling chandelier design.