1. On going alignment of sprinkler heads at acoustic ceiling @upper ground floor
2. On going fabrication of flanged tee (welded) for dry standpipe riser.



1. On going alignment of sprinkler heads at acoustic ceiling @upper ground floor
2. On going fabrication of flanged tee (welded) for dry standpipe riser.