Panel Boards Update – May 18, 2022
Installed panel boards, cable trays, gutters and terminated wires at ee room fourth floor 2. Installed panel boards, cable trays, […]
Installed panel boards, cable trays, gutters and terminated wires at ee room fourth floor 2. Installed panel boards, cable trays, […]
Site Visit & Inspection of Mr. Ruben Reyna & Mr. Fructucso Layrol of Landbank Dipolog
Installed floor drain at upper ground floor and second floor clinic area pipe chase
Installed cable trays for outdoor unit at roof deck gridlines 8-12/A-H 2. Arranged and terminated wires at roof deck GL
1. continue installation of mainline copper pipe from riser to outdoor unit connections at roofdeck GL 7 – 8 /