1. continue installation of mainline copper pipe from riser to outdoor unit connections at roofdeck GL 7 – 8 / D – H. Work 95% progress at riser 2
2. fixing of additional steel brackets to fit with the outdoor units in preparation to the installation of outdoor units at Third floor patient’s room GL 7 – 12 / E – F