1. Installed 120×30 lighting fixtures at second floor corridor-1 and corridor-2
2. Installed 120×30 lighting fixtures at upper ground floor corridor-1 and corridor-2


















1. Installed 120×30 lighting fixtures at second floor corridor-1 and corridor-2
2. Installed 120×30 lighting fixtures at upper ground floor corridor-1 and corridor-2