UCCPI PLUMBING ACTIVITIES (FEB 04, 2022)

1. Installation of blue pipes for aircon drain at fourth floor GL 2-3/C-E

2. Installation of gate valve at upper gournd floor GL 8-12/G-H

3. Installation of catch basin, culvert and ppr pipes for water drainage and water supply at lower ground floor