DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (PAINTING WORKS) @ FOURTH FLOOR LEVEL – July 28, 2022

2 years ago

1. Application of final color @ administration offices hallway/corridor 1, corridor 2, chief doctors and VIP OFFICES.

DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (PAINTING WORKS) FRONT AND LEFT SIDE ELEVATION AND HIGH CEILING CHANDELIER DESIGN – July 28, 2022

2 years ago

1. Application of final color and rectification of uneven concrete surfaces @ front elevation and Left side elevation above stone…

DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (CEILING WORKS) @ EMERGENCY ENTRANCE – July 28, 2022

2 years ago

1. Installation of ceiling framing, dropping and ficem board @ emergency entrance and drop off area.

DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (CEILING WORKS) @ SECOND FLOOR LEVEL AND HIGH CEILING – July 28, 2022

2 years ago

1. Installation of WPC (wood plastic composite) for wall cladding @ elevator lobby second floor is completed. 2. Installation of…

DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (MASONRY WORKS) @ FIRE ESCAPE 1 – 4 – July 28, 2022

2 years ago

1. Completed plastering and topping @ fire escape 2&3 from lower ground floor level up to roof deck level. 2.…

DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (MASONRY WORKS) @ LOWER GROUND FLOOR – July 28, 2022

2 years ago

1. On going installation of floor tiles @ lobby -1 lower ground floor level.

DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (ADMIN WORKS) @ THIRD FLOOR LEVEL – July 28, 2022

2 years ago

1. Completed installation of wooden doors @ patient rooms and semi private rooms including CR and pipe chase. ' 2.…