1.On going installation of roofing @ STP equipment room.
2. Concrete topping @ patient rooms 1-7 pipe chase third floor level.
3. Concrete topping@ semi private room 1-6 Third floor level.
4. Concrete topping@ pedia ward 1 and 2 and O/B ward 1 and 2 third floor level.
5. Installation of wooden doors jambs @ suspected and detoxification area perimeter door jambs ground floor level.