1. Erection of scaffolding for the retouching of exterior painting @ left side elevation exterior wall partition.
2. On going application of final color first coating and patching @ stair -1 ground floor level up to fourth floor.
3. On going application of boral for ceiling @ main lobby ground floor level.
4. On going application of boral for ceiling @ fourth floor level.