DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (MASONRY WORKS) @ LOWER GROUND FLOOR – July 28, 2022By Clarkie Tamin / September 4, 2022 1. On going installation of floor tiles @ lobby -1 lower ground floor level.