DCDC PROGRESS PHOTOS FOR THE MONTH OF JULY (CEILING WORKS) @ SECOND FLOOR LEVEL AND HIGH CEILING – July 28, 2022

1. Installation of WPC (wood plastic composite) for wall cladding @ elevator lobby second floor is completed.