DCDC DAILY ACTIVITY MASONRY WORKS – APRIL 18, 2022
1. On going installation of stair tiles @ stair-1 from third floor level up to mid landing fourth floor level. 2. Lay outing for concrete topping @ fire escape 1 and fire escape-3 from lower ground floor level up to roof deck level. 3. Plastering and edging of plant box @ main lobby ground floor